Facade Systems NEOM
واجهات ألمنيوم نيوم
NEOM and the wider Tabuk region are setting new standards for sustainable construction. Façade systems for these developments must meet project-specific environmental targets, performance requirements, and the logistical demands of remote sites. Saudi Aluminium Works provides façade contracting solutions for NEOM, Tabuk, and Red Sea developments, coordinating material sourcing, delivery, and on-site installation to support project requirements for quality, durability, and sustainability.
Sustainable Facades for Saudi Arabia
- Recycled aluminium: profiles and panels with 100% recycled content
- Environmental Product Declaration (EPD): [available / in development] for our main systems
- Embodied carbon reporting for facade packages
- Mostadam and LEED documentation for energy and materials credits
- BIPV facades that generate renewable energy on site
what we provide
Giga Project Facade Supplier
Sequenced Delivery
Facade materials delivered in installation order, with an estimated two to three days by road from Al Khobar.
Prefabricated Units
Façade solutions that reduce on-site labour and speed up installation.
Local Content
Documentation to support NEOM procurement and Saudi local content requirements.
What We Offer?
High Performance Facades for NEOM

Unitized curtain walls with Low-E glazing, solar shading and louvers to cut cooling demand, thermally broken windows and doors, and coastal-grade finishes built for Red Sea environments.
NEOM Regions and Destinations

Royal Commission for Makkah City and Holy Sites projects, including Masar Destination in Makkah and Rua Al Madinah in Madinah, are adding thousands of hotel rooms and public spaces.
Tabuk Aluminium Facades
Beyond NEOM, we supply facades for commercial, government and residential projects in Tabuk city.

